
Transient Analysis
- Water Hammer Calculation (incl. Francis, Pelton, Kaplan, Bulb, Francis Pump-turbine, Pumps, Ternary Units)
- Hydroelectric Transient Analysis (incl. DFIM VarSpeed)
- Energy Production Optimization (OptiPower software)
- Control System Optimization (incl. Turbine Gov., AVR, PSS)
System Stability
- Power Network Stability Analysis (incl. Isolated, Islanded, Interconnected Operation)
- Grid Code Compliance / Ancillary Services
- Part load vortex rope
- Full load vortex rope
- Rotor stator
- Speed no load

Complex Flow Analysis
- CFD Computation
- Hydroacoustic Resonance Analysis
- Two Phase Flow Phenomena
- Model Tests Follow-up
- Full Load / Part Load Surge Analysis
- Rotor Stator Interactions
Renov-Hydro
Quantify the true potential of hydropower considering:
- Concession ends
- Technology limits
- Environment conditions
- Costs
Develop a decision making assistant for hydropower project potential renovation and optimization by considering:
- Hydraulic structures
- Hydraulic turbines
- Electrical systems
- Services to the grid (Ancillary services)
Methodology
- Selection of the options
- Hydraulic performance table
- Simulation of 1 year
- Ancillary services


