REFERENCES
6x 340 MW
SNOWY 2.0 PSPP
AUSTRALIA
Transient analysis of SNOWY 2.0 pumped storage power plant equipped with 6×340 MW reversible Francis pump-turbine including 3 variable speed units. Transient analysis verification in pumping and generating mode, and hydraulic layout and surge tanks optimisation.
Photo Courtesy of and copyright to Snowy Hydro Limited
4x 232 MW
GOUVÃES PSPP
PORTUGAL
Transient analysis for 4×232 MW reversible Francis pump-turbines to be operated under a nominal head of 660 mWC, optimisation of upstream and downstream surge tanks.
Photo Courtesy Franz Georg Pikl
420 MW
FORCES MOTRICES
HONGRIN-LÉMAN SA
SWITZERLAND
Expertise in hydraulic transient simulations for 240 MW > 420 MW upgrade of Forces Motrices Hongrin-Léman Power Plant, including surge tank modifications and commissioning assistance with Hydro-Clone.
6x 150 MW
NANT DE DRANCE PSPP
SWITZERLAND
3x 423 MW
CLEUSON-DIXENCE HPP
SWITZERLAND
Transient analysis for the rehabilitation
of 1200 MW power plant with 3 Pelton
turbines and ancillary services optimisation.
4×230 MW
MONTÉZIC PSPP
FRANCE
Hydroelectric transient analysis of 930 MW Montézic pumped storage power plant, RTE Grid Code compliance.
185 MW
AVCE PSPP
SLOVENIA
Transient analysis of 185 MW variable speed pumped-storage power plant, influence of air vacuum valves and surge tank modifications.